On August 31, 2020, the Public Works Department and Forest Department signed a Memorandum of Understanding (MoU). Estimated total cost of construction as per approved DPP (2nd Revised) is BDT 1,610.77 ML and total number of buildings are 93 . 53 buildings handed over, 29 buildings ready for handover and remaining 11 buildings under construction at final stage.
Among the proposed buildings-
a) soft-story construction in coastal areas for addressing the impact of climate change,
b) 4-storied foundation on 2-storied site for divisional forest officer’s building considering valuable land in the urban area,
c) Architectural design and cost estimation,
d) Construction of an additional floor in the head office of the Forest Department at Agargaon,
Architectural design plans for construction work have been prepared by the department of Architecture. Structures of the architectural design of protected area is in progress. Construction work is going on as per rate schedule 2018 of Public Works Department. Digital survey and soil test of all buildings have been completed respectively except protected areas. ESMPs are developed for each building to ensure environmental protection.